48.
The average time recorded by work study man for an operation is called
standard time
normal time
representative time
none of these
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
2 comments Page 1 of 1.

Nvk said:   12 months ago
The correct answer is: standard time.

The average time recorded by a work-study man (or industrial engineer) for an operation is called standard time. Standard time is the time required to complete a task or operation, taking into account:

- The skill and ability of the worker
- The tools and equipment used
- The working conditions
- The allowed allowances (e.g., rest, breaks)

Standard time is used to:

- Establish a fair and realistic target time for workers
- Set production standards
- Measure worker performance
- Identify areas for improvement

The other options are not correct:

- Normal time refers to the actual time taken by a worker to complete a task, which may vary from standard time.
- Representative time is not a commonly used term in work-study or industrial engineering.

=> Standard time is an important concept in work-study and industrial engineering, as it helps to establish a baseline for measuring performance and identifying opportunities for improvement.

Measfin M said:   4 years ago
Standard time is right because it is the average time.