Civil Engineering - Water Supply Engineering - Discussion

Discussion Forum : Water Supply Engineering - Section 7 (Q.No. 31)
31.
The intake opening is generally covered by a screen to prevent entry of debris etc. and its level is kept
at the level of water of the source
at the bottom of water of the source
at about 2.5 m above the bottom
none of these.
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
1 comments Page 1 of 1.

Rupak Yadav said:   3 years ago
Please explain the answer.

Post your comments here:

Your comments will be displayed after verification.