Civil Engineering - Water Supply Engineering - Discussion

Discussion Forum : Water Supply Engineering - Section 3 (Q.No. 27)
27.
Critical time for developing a water hammer, is the time required for
closing the valve
the wave to travel from valve to the reservoir
the wave to travel from the valve to the reservoir and back
none of these.
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
1 comments Page 1 of 1.

Maya said:   4 years ago
Why not A? Please explain the answer.

Post your comments here: