Civil Engineering - Water Resources Engineering - Discussion

Discussion Forum : Water Resources Engineering - Section 3 (Q.No. 26)
26.
For efficient working of a control meter, its throat length is approximately kept
equal to the critical depth
twice the critical depth
three times the critical depth
four times the critical depth.
Answer: Option
Explanation:
No answer description is available. Let's discuss.