Civil Engineering - Water Resources Engineering
Exercise : Water Resources Engineering - Section 3
- Water Resources Engineering - Section 1
- Water Resources Engineering - Section 2
- Water Resources Engineering - Section 3
26.
For efficient working of a control meter, its throat length is approximately kept
27.
A control meter is preferred to a weir because
28.
A river is said to be of uniform section if in its section
29.
The run off is affected by
30.
The form factor of a drainage basin is obtained by dividing
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers