Civil Engineering - Water Resources Engineering

Exercise : Water Resources Engineering - Section 3
51.
Ryve's formula for flood estimate in cumecs, is
Q = CA3/4
Q = CA2/3
Q = CA1/2
Q = CA1/4.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

52.
Levees and flood walls,
are designed to carry unbalanced water load
are designed with adequate dimensions
are means of controlling floods
are never provided free-boards.
Answer: Option
Explanation:
No answer description is available. Let's discuss.