Civil Engineering - Waste Water Engineering - Discussion

Discussion Forum : Waste Water Engineering - Section 2 (Q.No. 4)
4.
Rate of flow of sewage is generally assumed
more than the rate of water supply
equal to the rate of water supply
less than the rate of water supply
at 150 litres per capita.
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
12 comments Page 1 of 2.

Vinothkumar said:   8 years ago
Opt D is for min per capita for design of sewer pipe, so I think option c.

Dr. Kachhot said:   7 years ago
The velocity is less than the water because its specific gravity is high.

Walde said:   9 years ago
80% to 70% of water converted into sewage. I think option C is right.

Sam said:   9 years ago
@Walde

You are right it is assumed as 0.75 to .8 that of supplied.

Ram meena said:   7 years ago
I think C is right because 80% water goes in sewer 20% are losses.

Sourabh said:   5 years ago
Water supply is converted into 80% of sewage rest 20% is consumed.

DHENGE SHAHADEO said:   4 years ago
I think the correct answer is option D. At 150lit/capita.

Bharath said:   1 decade ago
Usually 60 % of watersupply taken as sewage flow.

Thiru said:   8 years ago
Option c is right. Less then the water supply.

Subhash Chandra said:   7 years ago
Generally, It is taken as 80% of water supply.


Post your comments here:

Your comments will be displayed after verification.