23.
The screens are fixed
perpendicular to the direction of flow
parallel to the direction of flow
at an angle 30° to 60° to the direction of flow
none of these.
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
5 comments Page 1 of 1.

Adhi said:   9 years ago
I go with option A because screens are placed perpendicular to flow so as to separate the solids particles.

Shawshank said:   9 years ago
To expose more surface area to flowing water and easy cleaning.

Ram said:   8 years ago
Option C is right because its area of the discharge is high and velocity is low.

Ali raza said:   5 years ago
The screen are placed inclined to horizontal flow at the angel of 45 to 60 degree.

Kanchan Roy said:   5 years ago
45° is the answer.