Civil Engineering - Waste Water Engineering - Discussion
Discussion Forum : Waste Water Engineering - Section 1 (Q.No. 23)
23.
The screens are fixed
Discussion:
5 comments Page 1 of 1.
Kanchan Roy said:
5 years ago
45° is the answer.
Ali raza said:
5 years ago
The screen are placed inclined to horizontal flow at the angel of 45 to 60 degree.
Ram said:
8 years ago
Option C is right because its area of the discharge is high and velocity is low.
Shawshank said:
9 years ago
To expose more surface area to flowing water and easy cleaning.
Adhi said:
9 years ago
I go with option A because screens are placed perpendicular to flow so as to separate the solids particles.