29.
For full face method, the excavation to be done is generally divided into
two sections
three sections
four sections
five sections.
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
3 comments Page 1 of 1.

Vaibhav P said:   8 years ago
Correct answer is Single Section.

Full Face = Complete Face Section at once.
Full face method is exclusively used for tunnel sections of lesser c/s area. The method involves excavation of the whole section at once limited to certain depth in the direction of tunneling. Working of TBM falls under this category.
(2)

Umesh Y said:   6 years ago
Exactly @Vaibhav P.

I don't get it how the answer is three.
(1)

Bhushan said:   3 years ago
Excavations are done at the same time in three sections is the right answer.