Civil Engineering - Surveying - Discussion

Discussion Forum : Surveying - Section 2 (Q.No. 37)
37.
Deviation of the actual road gradient from the proposed contou'r gradient up hill side, involves
embankment on the centre line
excavation on the centre line
earth work on the centre line
none of these.
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
2 comments Page 1 of 1.

Garry said:   8 years ago
Because in hilly areas, flatter gradients are generally required which requires earthwork calculation for excavation.

Aggie said:   9 years ago
Please explain what is this?

Post your comments here:

Your comments will be displayed after verification.