Civil Engineering - Surveying
Exercise :: Surveying - Section 2
36. |
The conventional sign shown in below figure represents a
 |
A. |
bridge carrying railway below road | B. |
bridge carrying road below railway | C. |
bridge carrying road and railway at the same level | D. |
a level crossing. |
Answer: Option A
Explanation:
|
37. |
Deviation of the actual road gradient from the proposed contou'r gradient up hill side, involves |
A. |
embankment on the centre line | B. |
excavation on the centre line | C. |
earth work on the centre line | D. |
none of these. |
Answer: Option B
Explanation:
|
38. |
Measuring with a 30 m chain, 0.01 m too short, introduces |
A. |
positive compensating error | B. |
negative compensating error | C. |
positive cumulative error | D. |
negative cumulative error. |
Answer: Option C
Explanation:
|
39. |
Setting out a curve by two theodolite method, involves |
A. |
linear measurements only | B. |
angular measurements only | C. |
both linear and angular measurements | D. |
none of these. |
Answer: Option B
Explanation:
|
40. |
When the bubble of the level tube of a level, remains central |
A. |
line of sight is horizontal | B. |
axis of the telescope is horizontal | C. |
line of collimation is horizontal | D. |
geometrical axis of the telescope is horizontal. |
Answer: Option A
Explanation:
|