Civil Engineering - Surveying
Exercise : Surveying - Section 2
36.
The conventional sign shown in below figure represents a


37.
Deviation of the actual road gradient from the proposed contou'r gradient up hill side, involves
38.
Measuring with a 30 m chain, 0.01 m too short, introduces
39.
Setting out a curve by two theodolite method, involves
40.
When the bubble of the level tube of a level, remains central
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers