Civil Engineering - Surveying - Discussion
Discussion Forum : Surveying - Section 1 (Q.No. 44)
44.
For the construction of highway (or railway)
Discussion:
2 comments Page 1 of 1.
Naveen said:
1 decade ago
We need both L/S and C/S because at every interval there might difference in land profile so that we will get clear idea of landfilling or cutting to maintain level surface.
Sura said:
8 years ago
For construction highway or railway we take longitudinal and cross sectional level in regular interval from that we can easily determined the cutting and filling volume.
Post your comments here:
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers