Civil Engineering - Surveying - Discussion
Discussion Forum : Surveying - Section 1 (Q.No. 44)
44.
For the construction of highway (or railway)
Discussion:
2 comments Page 1 of 1.
Sura said:
8 years ago
For construction highway or railway we take longitudinal and cross sectional level in regular interval from that we can easily determined the cutting and filling volume.
Naveen said:
1 decade ago
We need both L/S and C/S because at every interval there might difference in land profile so that we will get clear idea of landfilling or cutting to maintain level surface.
Post your comments here:
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers