24.
The correction to be applied to each 30 metre chain length along θ° slope, is
Discussion:
26 comments Page 3 of 3.
Shubham said:
4 years ago
We know that slope correction is L(1-cosθ) and this is only correct..If you take sec then where that denominator will go then? Please anyone explain me.
(1)
Ashish said:
4 years ago
@Madhu.
I agree with your answer. Great thanks.
I agree with your answer. Great thanks.
Tofik said:
4 years ago
@Madhu.
AB not equal L it Lcosθ.
AB not equal L it Lcosθ.
Vijay vj said:
3 years ago
l is slope length and D is the horizontal distance and θ angle of slope.
Now the error is;
L-D.
L-Lcos(θ)
L(1-cos(θ)) this is error always positive.
Correction = - error.
= - [L (1-cos(θ)].
= L[cos(θ) -1].
This is my answer.
Now the error is;
L-D.
L-Lcos(θ)
L(1-cos(θ)) this is error always positive.
Correction = - error.
= - [L (1-cos(θ)].
= L[cos(θ) -1].
This is my answer.
(2)
Shubham Kumar said:
3 years ago
Hypotensual correction: L(secθ-1).
Slope correction: L(cosθ-1).
Thank you!
Slope correction: L(cosθ-1).
Thank you!
(1)
Emtiaz Ahammed said:
3 years ago
@All
Correction along with hz line = L(cosθ-1).
Correction along with slope= L(1-cosθ) or L(secθ-1).
Correction along with hz line = L(cosθ-1).
Correction along with slope= L(1-cosθ) or L(secθ-1).
(2)