Civil Engineering - Surveying - Discussion
Discussion Forum : Surveying - Section 1 (Q.No. 43)
43.
The main principle of surveying is to work
Discussion:
5 comments Page 1 of 1.
Taimoor said:
6 years ago
My opinion is C.
The main survey should be a higher level to the lower level.
The main survey should be a higher level to the lower level.
Pankaj yadav said:
8 years ago
Survey work from whole to part has more accuracy. Error does not increase.
(1)
Habib said:
9 years ago
Main principle of servey is from whole to part of area.
Pavitra said:
10 years ago
To prevent the accumulation error. For example if we are going to draw a straight line using chain surveying whose length is more than four chainages (4*30m), by adopting part to whole, the small distraction in first chainage leads to a great error by reaching the final point. Hence by adopting whole to part we can reduce such errors.
Gyaneswar said:
10 years ago
According to whole to part principle whole area enclosed by main survey line & station. Then area divided into well conditioned triangles.
This principle help to prevent accumulation error. If any error in the measurement of any sides of triangle not affect the whole work.
This principle help to prevent accumulation error. If any error in the measurement of any sides of triangle not affect the whole work.
Post your comments here:
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers