22.
A structure is erected on an impervious clay whose thickness is 12 m. Drainage is possible both at upper and lower surfaces. Coefficient of consolidation is 0.015 cm2 per minute. For attaining 50% consolidation with a time factor 0.20, the number of days required
Discussion:
16 comments Page 1 of 2.
Zohaib Mirali said:
1 year ago
Yes, 3333.333 days is the correct answer.
Duha said:
1 year ago
C = 0.015cm^2/m * 1/10000 * 24 * 60.
= 0.00216m^2/day.
H = h/2.
Tv = Cv * t/H^2.
t = 0.2 * 36/0.00216 = 3333.
= 0.00216m^2/day.
H = h/2.
Tv = Cv * t/H^2.
t = 0.2 * 36/0.00216 = 3333.
Pavan said:
4 years ago
It is 3333.333.
Dipunku said:
5 years ago
Yeah, 3333.33 days is the correct answer.
(2)
Anurag said:
7 years ago
The correct answer is 3333.33 day.
(1)
Sudanshu said:
8 years ago
Time factor T=(c*t)/d^2.
T=0.2
D=1200
d = 1200/2
= 600.
Time reqd for consolidation t=(0.2*600^2)/0.015=4800000/(25*60)=3333.
T=0.2
D=1200
d = 1200/2
= 600.
Time reqd for consolidation t=(0.2*600^2)/0.015=4800000/(25*60)=3333.
(1)
Praful sl said:
8 years ago
Tv for 50% consolidation is 0.2 ie (pie/4*u^2) gives roughly 0.196~ 0.2 and the answer is 3333.33 days.
Garry said:
8 years ago
The correct ans is 3333.33 days.
Arya said:
8 years ago
Agree @Anisha.
Anisha said:
8 years ago
Can anyone explain the importance of 50 percentage consolidation mentioned in the question?