Civil Engineering - RCC Structures Design - Discussion

Discussion Forum : RCC Structures Design - Section 1 (Q.No. 5)
5.
Post tensioning system
was widely used in earlier days
is not economical and hence not generally used
is economical for large spans and is adopted now a days
none of these.
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
43 comments Page 3 of 5.

Gayatri said:   1 decade ago
Yes we are use the prestress concrete for box girder in bridge.

Flint said:   9 years ago
Anybody knows about interaction diagram? Please explain.

Jivan shrestha said:   8 years ago
Is economical for large spans and is adopted now a days.

Srinivas said:   10 years ago
Generally used in T-beam girder bridges if any loading.

Amresh kumar meena said:   9 years ago
As per my knowledge the correct answer is "C".

Chithra t.m said:   1 decade ago
Post tensioning is how useful are economical?

Vinay kumar said:   7 years ago
Yes, answer C is the most appropriate answer.
(1)

Uday Shankar said:   7 years ago
Yes, I think C is the appropriate answer.

Anil said:   7 years ago
It is economical against structural form.

Hossein said:   9 years ago
I too think the answer will be "C".