Civil Engineering - Highway Engineering - Discussion

Discussion Forum : Highway Engineering - Section 1 (Q.No. 23)
23.
First operation during the detailed survey of a hill road, is
hydrological and soil surveys
adjustment of alignment along with curves
derivation of longitudinal and cross-sections
fixation of Bench Marks
staking the ground.
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
7 comments Page 1 of 1.

Ahsan said:   2 years ago
Fixation of Bench Marks is usually the first step in the detailed survey of a hill road. Bench Marks are permanent reference points established at regular intervals along the road alignment.

They serve as a basis for all subsequent survey measurements and help ensure accurate and consistent elevation data throughout the project. Once the Bench Marks are fixed, they provide a reference for conducting hydrological and soil surveys, adjusting the alignment, deriving longitudinal and cross-sections, and staking the ground.
(1)

Vision said:   3 years ago
At first assume reference known point, then detailing should be done from these point.

Sanjay kumar said:   4 years ago
@All.

Please tell me a serial wise operations alternative.

Dipu bunku rose said:   5 years ago
For building what will be the answer?

Hisham said:   6 years ago
Staking means setting out.

Sudheer said:   7 years ago
What is sticking of ground? Anyone please explain.

Vinod said:   8 years ago
Anyone explain ?