Civil Engineering - Highway Engineering

21.
If C is basic capacity per lane, V is velocity in km/hour, S is stopping distance pluslength of the vehicles in metres, the formula is applicable to
district roads
two lane roads
two lane roads in one direction
none of these.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

22.
Width of vehicles affects the width of
lanes
shoulders
parking spaces
all the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

23.
First operation during the detailed survey of a hill road, is
hydrological and soil surveys
adjustment of alignment along with curves
derivation of longitudinal and cross-sections
fixation of Bench Marks
staking the ground.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

24.
The period of long term plan for the development of roads in India, known as Bombay Plan (Aug. 1958), is
5 years
10 years
15 years
20 years
25 years
Answer: Option
Explanation:
No answer description is available. Let's discuss.

25.
In water bound macadam roads, binding material, is
sand
stone dust
cement
brick dust.
Answer: Option
Explanation:
No answer description is available. Let's discuss.