Civil Engineering - Highway Engineering
Exercise : Highway Engineering - Section 1
21.
If C is basic capacity per lane, V is velocity in km/hour, S is stopping distance pluslength of the vehicles in metres, the formula
is applicable to

22.
Width of vehicles affects the width of
23.
First operation during the detailed survey of a hill road, is
24.
The period of long term plan for the development of roads in India, known as Bombay Plan (Aug. 1958), is
25.
In water bound macadam roads, binding material, is
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers