Civil Engineering - Highway Engineering

21. 

If C is basic capacity per lane, V is velocity in km/hour, S is stopping distance pluslength of the vehicles in metres, the formula is applicable to

A. district roads
B. two lane roads
C. two lane roads in one direction
D. none of these.

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

22. 

Width of vehicles affects the width of

A. lanes
B. shoulders
C. parking spaces
D. all the above.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

23. 

First operation during the detailed survey of a hill road, is

A. hydrological and soil surveys
B. adjustment of alignment along with curves
C. derivation of longitudinal and cross-sections
D. fixation of Bench Marks
E. staking the ground.

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

24. 

The period of long term plan for the development of roads in India, known as Bombay Plan (Aug. 1958), is

A. 5 years
B. 10 years
C. 15 years
D. 20 years
E. 25 years

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

25. 

In water bound macadam roads, binding material, is

A. sand
B. stone dust
C. cement
D. brick dust.

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.