Civil Engineering - Highway Engineering - Discussion
Discussion Forum : Highway Engineering - Section 6 (Q.No. 29)
29.
Pick up the correct statement from the following:
Discussion:
3 comments Page 1 of 1.
Alia said:
7 years ago
What is spoil bank?
(1)
Rahul said:
6 years ago
No, Spoil bank is located two sides of the right of way.
Agha Bilal said:
10 months ago
Here, Option D) All the above is the correct answer.
@Alia.
Spoil banks are piles of soil that result from the creation of a canal, deepened channel, barrow pit, or some similar structure. They are unnatural and always have an effect on the area where they are situated.
@Alia.
Spoil banks are piles of soil that result from the creation of a canal, deepened channel, barrow pit, or some similar structure. They are unnatural and always have an effect on the area where they are situated.
(1)
Post your comments here:
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers