32.
The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by prismoidal formula, is
3250 m3
3225 m3
3275 m3
3300 m3
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
17 comments Page 2 of 2.

Burra pavan said:   4 years ago
Please explain the detail answer.
(1)

Rishabh Machiwal said:   7 years ago
The correct Answer is option A.

Paramjit Paul said:   5 years ago
Can anyone solve it in detail?
(1)

Saleha said:   6 months ago
Please explain me clearly.

SUMIT KUMAR said:   5 years ago
3250 is the right answer.
(1)

Anirban said:   9 years ago
Can anyone solve clearly?

Raj said:   6 years ago
Please explain clearly.