Civil Engineering - Estimating and Costing - Discussion

Discussion Forum : Estimating and Costing - Section 2 (Q.No. 32)
32.
The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by prismoidal formula, is
3250 m3
3225 m3
3275 m3
3300 m3
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
17 comments Page 2 of 2.

Adnan said:   4 years ago
There is not clear idea in them.

Trapezoidal base area is a+b/2 into h.

Then it is getting the wrong value.

is there someone to do step by step it? Anyone explain it, please.

Sb221 said:   4 years ago
I'm not getting this, Please explain the answer.

Santosh said:   5 years ago
Please explain the solution clearly.

Irfan said:   6 years ago
Not getting it, please solve it clearly.

Raj said:   6 years ago
Please explain clearly.

Rishabh Machiwal said:   7 years ago
The correct Answer is option A.

Anirban said:   9 years ago
Can anyone solve clearly?