The detention period in a septic tank is assumed
Discussion:
25 comments Page 2 of 3.
Shahnawaz said:
8 years ago
24 to 48 hours is correct.
Ritesh maurya said:
8 years ago
30minute is correct.
Sujju bhai said:
8 years ago
It's for skimming tank 40 mins.
Raj said:
8 years ago
24 to 48 hrs is correct.
Tanu said:
8 years ago
12-36 hours is the correct one.
Mayur said:
7 years ago
12 to 36 hours.
Ranjan barman said:
7 years ago
As per I.S, the detention period of septic assumes 30 minutes.
(1)
Kiran Awaradi said:
7 years ago
The disposal of sewage from the septic tank is done by which of the following? Explanation: Soak pit is a circular pit through which sewage is disposed in the soil.
i.e: The septic tank has a long detention period in comparison to sedimentation than with a detention period of 12 to 36 hours.
i.e: The septic tank has a long detention period in comparison to sedimentation than with a detention period of 12 to 36 hours.
Pankaj kumar verma said:
6 years ago
12-36 hours (but 24hours in designing).
Danish said:
5 years ago
12 hr -36 HR is the correct one.