17.
Pick up the incorrect statement from the following:
Discussion:
5 comments Page 1 of 1.
Gyanendra Thakur said:
4 years ago
Critical path is longest path but take minimum period.
(2)
Mahesh said:
5 years ago
Maximum time Critical Path.
Minimum time is Node.
Minimum time is Node.
Afia said:
5 years ago
Minimum time is called nodes.
(2)
Srinivasan said:
6 years ago
The maximum time is called a critical path.
(1)
Har said:
8 years ago
The activity which consumes maximum time is called critical.