17.
Pick up the incorrect statement from the following:
The activity is the time consuming part of a project
The beginning and end of a job, are called events
The activity which consumes maximum time, is called a node
Logically and sequentially connected activities and events form a network
None of these.
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
5 comments Page 1 of 1.

Gyanendra Thakur said:   4 years ago
Critical path is longest path but take minimum period.
(2)

Mahesh said:   5 years ago
Maximum time Critical Path.

Minimum time is Node.

Afia said:   5 years ago
Minimum time is called nodes.
(2)

Srinivasan said:   6 years ago
The maximum time is called a critical path.
(1)

Har said:   8 years ago
The activity which consumes maximum time is called critical.