17. 

Pick up the incorrect statement from the following:

[A]. The activity is the time consuming part of a project
[B]. The beginning and end of a job, are called events
[C]. The activity which consumes maximum time, is called a node
[D]. Logically and sequentially connected activities and events form a network
[E]. None of these.

Answer: Option C

Explanation:

No answer description available for this question.

Har said: (Aug 30, 2017)  
The activity which consumes maximum time is called critical.

Srinivasan said: (Jul 12, 2019)  
The maximum time is called a critical path.

Afia said: (Sep 26, 2020)  
Minimum time is called nodes.

Mahesh said: (Oct 21, 2020)  
Maximum time Critical Path.

Minimum time is Node.