14.
Pick up the correct statement from the following i.
Higher workability indicates unexpected increase in the moisture content
Higher workability indicates deficiency of sand
If the concrete mix is dry, the slump is zero
Concrete mix having zero slump, is unsuitable for high strength.
All the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
9 comments Page 1 of 1.

Master said:   5 years ago
No, Option C may be wrong.

In My point of view, if the concrete is dry (i.e., low), the slump value ranges from 25 to 75. It may not be necessarily zero.
(2)

Detective said:   5 years ago
Finer partical has more surface area which cause required more cement paste for lubrication and decreased the workability. So deficiency of fine sand increased the workability of mix.

MD Shekhar said:   8 years ago
Illustration of Option B: Higher the quantity of sand, higher the surface area, higher be the paste requirement. Hence at constant cement W/C ratio, cement will be deficient to paint whole surface to gain that amount of workability.
(1)

Tailam said:   8 years ago
Well said @Gouthu.

Gouthu said:   8 years ago
@Anshu.

The workability increases with increase in using coarse agg (surface area is less thus increases flow) thus amount of sand decreases.

Anshu majumdar said:   9 years ago
Explain the option B.

Shashank verma said:   9 years ago
Please explain B clearly.

DARSHAN H A said:   9 years ago
Workability increases as water content increases.

If mix is dry slump is zero.

Dry mix having zero slump cannot give high sternght.

B panchal said:   1 decade ago
Please clear option A & B.