36.
Pick up the incorrect statement from the following:
37.
Permissible compressive strength of M 200 concrete grade is
38.
In slump test, each layer of concrete is compacted by a steel rod 60 cm long and of 16 mm diameter for
39.
If the average compressive strength is 4000 kg/cm2 and standard deviation is 500, the co-efficient of variation is
40.
For preparing ordinary concrete, the quantity of water used, is