Civil Engineering - Building Construction - Discussion

Discussion Forum : Building Construction - Section 1 (Q.No. 11)
11.
The taper of precast concrete pile should not be more than
1 cm per metre length
2 cm per metre length
4 cm per metre length
5 cm per metre length.
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
11 comments Page 1 of 2.

Khan said:   4 years ago
It's like when you measure the pile waist at one point and then one meter below so the difference should not be more than 2cm.

So, the taper is the decreasing size of the pile towards the base and it should not be more than 2 cm per meter.
(2)

Kalyani said:   10 years ago
Reducing the size from one end to another end.
(1)

Shubhajit chakrabarty said:   8 years ago
It is a rectangle shape with having height whose top end has bigger dimension and lower end has smaller dimension. Example: if we cut the top or crown horizontally of a pyramid then it convert a tapered section.
(1)

Kish Christian said:   1 decade ago
What is a taper?

Avinash said:   9 years ago
Yes, Kalyani is right.

Prabir said:   9 years ago
Can you discuss it briefly! @Kalyani.

Bhanu reddy said:   9 years ago
Can you tell me briefly about that?

Mohamed said:   9 years ago
The taper is the pile's head, a part of an object in the shape of a cone.

Abhimanyu singh said:   8 years ago
I didn't understand it. Please explain it for me.

PK pranab said:   8 years ago
Which is best for pile - taper or square pocket (extra base over the main base)?

Please, anyone, explain.