Civil Engineering - Building Construction - Discussion
Discussion Forum : Building Construction - Section 1 (Q.No. 17)
17.
The portion of a brick cut across the width, is called
Discussion:
23 comments Page 1 of 3.
Bunny said:
3 years ago
Along the width and across the length is called BAT, along the length and across the width is called Closer.
(12)
Asif Ali said:
5 years ago
Closer Brick: The portion of a brick cut across the length.
Half Brick: The portion of brick cut to half its length.
Bed: The bed is the mortar upon which a brick is laid.
Bat: The portion of a brick cut across the width.
Half Brick: The portion of brick cut to half its length.
Bed: The bed is the mortar upon which a brick is laid.
Bat: The portion of a brick cut across the width.
(4)
Noel said:
5 years ago
Across the width = Along the Length = Closer.
Across the length = Along the width = bat.
Across the length = Along the width = bat.
(3)
Faheem Afridi said:
4 years ago
The answer must be Clouser because statement shows cutting brick across the width(means cutting width in two parts or at cutting at a right angle).
Brick cutting across Width/2 = Clouser.
Brick cutting across length/2 = Bat.
Brick cutting across Width/2 = Clouser.
Brick cutting across length/2 = Bat.
(2)
Wali ullah said:
5 years ago
Across means perpendicular while along with means parallel to something. So the right answer is D.
(2)
@khilesh said:
3 years ago
According to me, A is the correct answer.
(1)
Tejashri said:
6 years ago
When the brick cut along the length & across width is called 'Bat' and along the width & across length is called 'Closer'.
Rahman said:
3 years ago
You are right, Thanks @Parveen.
Sikku said:
4 years ago
Across mean perpendicular or normal to the given front side.
So, my answer is closer.
So, my answer is closer.
Monu agrawal said:
5 years ago
You are correct @Noel.
Post your comments here: