Discussion Forum : Building Construction - Section 1 (Q.No. 37)
37.
The single stage well point system of dewatering an excavation can be used if the depth of excavation does not exceed
Discussion:
4 comments Page 1 of 1.
Lesner said:
9 years ago
What is single stage well point system?
(2)
Chintu said:
8 years ago
Actually, 4.5 for single stage and 15 m for multistage. After 15m well point system cannot be used.
(1)
Shahzaman said:
1 decade ago
The single stage well point system of dewatering and excavation can be used if the depth of excavation does not exceed.
Rahul said:
8 years ago
For single stage is 5m for multi stage up to 15m and different elevation.
Post your comments here: