16.
An arch may fail due to
uneven settlement of abutments
sliding of voussoirs
crushing of the material
all the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

17.
Pick up the correct statement from the following :
Cavity of a cavity wall should start near ground level
Cavity of a cavity wall should terminate near eaves level of sloping roof
Cavity of a cavity wall should terminate near coping of flat roof with parapet wall
Damp proof course for two leaves of a cavity wall, is laid separately but at the same level
All the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

18.
In soft clay of low bearing capacity, the type of steel pile generally used, is
H-pile
screw pile
disc pile
pipe pile
raking pile.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

19.
Stability of an existing structure may be disturbed by
rising of water table
vibrations caused by traffic movements
mining in the neighbourhood
excavation in the neighbourhood
all the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

20.
According to National Building Code, the hydrants in water mains is provided at minimum interval of
50 m
60 m
75 m
90 m.
Answer: Option
Explanation:
No answer description is available. Let's discuss.