Civil Engineering - Building Construction

11.
Pick up the incorrect statement from the following :
Horizontal D.P.C. is provided at plinth level in internal walls
D.P.C. is provided under door and verandah openings
Vertical D.P.C. is not provided in internal walls
Cement concrete is a rigid damp-proofing material.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

12.
For plastering the exposed brick walls, the cement sand mortar should be
1:2
1:3
1:4
1:6
1:8.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

13.
The construction joints in buildings are provided after
10 m
15 m
20 m
40 m
60 m.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

14.
The arrangement made to support an unsafe structure temporarily, is known as
shoring
scaffolding
underpinning
jacking
none of these.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

15.
Pick up the correct statement from the following :
D.P.C. should be continuous
D.P.C. should be of good impervious material
D.P.C. may be horizontal or vertical
All the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.