Civil Engineering - Building Construction
Exercise : Building Construction - Section 3
31.
If the depth of an excavation is 20 metres, number of single stage well points to be installed at various levels, is
32.
The minimum distance between the centres of bulb of diameter du, of a multi under reamed piles, is
33.
The method of moving each brick through a small horizontal distance before it is finally laid in any brick wall and pressing it by means of brick hammer, is known as
34.
The stone whose crushing strength is maximum, is
35.
The vertical member running through middle of a shutter frame, is
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers