Civil Engineering - Building Construction

26.
Which one of the following piles has a cast iron shoe even after removal of the hollow cylindrical steel casing
simplex pile
pedastal pile
Franki pile
vibro pile
both (a) and (d) of the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

27.
If height of the first storey of a building is 3.2 m and riser is 13 cm, the number of treads required, is
12
18
24
25
30.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

28.
Pick up the correct statement from the following :
the sand in the sand pile is well compacted
the sand is kept moist at the time of placing and tamping
the top one metre of the pile is filled up with cement concrete to provide a cap for the filled up sand
sand piles are generally used under column loads
all of the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

29.
Pick up the incorrect statement from the following :
In king post truss, one vertical post is used
In a queen post truss, one vertical post is used
In a queen post truss, two vertical posts are used
None of these.
Answer: Option
Explanation:
No answer description is available. Let's discuss.

30.
For effective drainage, the finished surface of flat roof should have a minimum slope of
1 in 20
1 to 50
1 in 10
1 in 5.
Answer: Option
Explanation:
No answer description is available. Let's discuss.