Civil Engineering - Airport Engineering - Discussion

Discussion :: Airport Engineering - Section 1 (Q.No.33)

33. 

Pick up the correct statement from the following:

[A]. The centre line of the approach area coincides with that of the runway
[B]. Approach areas are measured in horizontal surfaces
[C]. The imaginary inclined plane which is directly above the approach area is called approach surface
[D]. Obstruction clearance surface and approach surface are same
[E]. All the above.

Answer: Option E

Explanation:

No answer description available for this question.

Post your comments here:

Name *:

Email   : (optional)

» Your comments will be displayed only after manual approval.