Chemical Engineering - Process Equipment and Plant Design - Discussion
Discussion Forum : Process Equipment and Plant Design - Section 1 (Q.No. 35)
35.
The operating velocity in the absorption tower is usually 40-50% of the flooding velocity. Packed absorption towers are normally designed for a pressure drop of about __________ mm of water column per metre height of packing.
Discussion:
Be the first person to comment on this question !
Post your comments here:
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers