Discussion Forum : Process Equipment and Plant Design - Section 1 (Q.No. 35)
35.
The operating velocity in the absorption tower is usually 40-50% of the flooding velocity. Packed absorption towers are normally designed for a pressure drop of about __________ mm of water column per metre height of packing.
1-5
20-40
100-150
1000-1500
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
Be the first person to comment on this question !