11.
Block diagram of a simple standard control system is shown below in the figure.

Which of the following statement about the above control system is wrong ?

Which of the following statement about the above control system is wrong ?
12.
Water is flowing through a series of four tanks and getting heated as shown in figure. It is desired to design a cascade control scheme for controlling the temperature of water leaving the tank 4 as there is a disturbance in the temperature of a second stream entering the tank 2. Select the best place to take the secondary measurement for the second loop.


13.
The term analogous to voltage in a single tank system is the
14.
In a shell and tube heat exchanger, the outlet temperature of heating/cooling fluid is the __________ variable.
15.
Mcleoid gauge is used to measure the