A does 80% of a work in 20 days. He then calls in B and they together finish the remaining work in 3 days. How long B alone would take to do the whole work?
23 days
37 days
371/2
40 days
Answer: Option
Explanation:

Whole work is done by A in ( 20 x 5 ) = 25 days.
4

Now, ( 1 - 4 ) i.e., 1 work is done by A and B in 3 days.
5 5

Whole work will be done by A and B in (3 x 5) = 15 days.

A's 1 day's work = 1 , (A + B)'s 1 day's work = 1 .
25 15

Therefore B's 1 day's work = ( 1 - 1 ) = 4 = 2 .
15 25 150 75

So, B alone would do the work in 75 = 37 1 days.
2 2

Discussion:
164 comments Page 14 of 17.

Ram@Sravs said:   1 decade ago
Hi. @Supreeth:

In St-4:

Why had you reversed the 2/25 part to 25/2 and multiplied with 3?

Can you Explain please.

Chandu said:   1 decade ago
80% = 20 days.
100% = 20x100/80 = 25 days.

i.e. A alone can do whole work in 25days, A's one day work = 1/25.

But A worked 20 days (it mean 20/25 work completed)remaining 5/25.

A+B worked for 3 days to complete the remaining 5/25 part of work.

A's 3 days work = 1/25+ 1/25+ 1/25 = 3/25.

Remaining 2/25 part of work is done by B in 3 days.

3 days----2/25.
1 day-----?.
1 day----2/(25*3) = 2/75.

Total work done by B is 75/2 = 37 1/2.

Supreeth said:   1 decade ago
St-1:

80%=20.

.'.(100*20)/80 = 25 days.

100%=?

St-2:

For 23 days A would have completed 23/25 part of the work,

St-3:

(25/25)-(23/25) = 2/25 part of work is completed by B in 3 days.

St-4:

.'. in 1 day (25/2)*3 = 37 1/2.

Riyaz said:   1 decade ago
A does 80% of work in 20 days which means he does 4% of work in a day (80/20 =4).

A and b does the remaining 20% work in 3 days which means in this 20 % of work A's contribution will be 4*3=12%.

Work done by b in 3 days = 20-12 = 8%.

Work done by b in 1 day = 8/3= 2.66.

Time taken by B to complete whole work= 100/2.66= 37.59.

We can't get exact answer but this will be time consuming.
(1)

Ajith said:   1 decade ago
1) 100*20/80 =25.

2) Total work done in 25 days.

3) Remaining work finished in 5 days.

4) If A&B work together 3*5=15.

5) A's one days work 1/25.

6) A+B one days work 1/15.

7) 1/15 - 1/25 = 4/150= 2/75.

8) So B alone would do the work in 75/2= 37 1/2.

Yogesh said:   1 decade ago
My method:

A's 1% work done time = 80/20 = 4%.

Means in 1 day a completes 4%......(1).

Now,

A+B 1 day work = 20/3.

B work = 20/3 - 4/1 = 8/3.

B work in 1 day = 8/3 ---- (2).

So now,

For 100% work by B is:

8/3*1/100 = 300/8 = 37.5 days. work

Answer..(:

$ha$ha said:   1 decade ago
Let total work=100%.

A do 80% work = 20 days.
A's 1 day work= 1/20 * 80% i:e 1/20 * 80/100 = 2/50.

Now,Remaining work is 100-80=20%.

So, A and B together complete remaining work i.e 20% in 3days.

Therefore A and B 1 day work = 1/3 * 20% i:e 1/3 * 20/100= 1/15.

Now, B's alone 1 day work is,

A+B=1/15

2/50+B=1/15

B=1/15 - 2/50 = 10-6/150 = 2/75.

Now, B alone can complete work in 75/2 days i.e option C.

Alle chandra shekar said:   1 decade ago
Please tell me short cut method.

Chandana said:   1 decade ago
80/100 = 4/5.

5/4*20 = 25days.

A and B completes the remaining work in 3 days i.e.,

3*5 = 15days.

A's 1 days work is 1/25.
B's 1 days work is 1/15.

Therefore, b's one days work will be,

1/5-1/25 = 5-3 / 75 = 2/75 i.e 75/2 will give us 37.5, So B alone will complete the entire work in 37.5 OR 37 1/2 :)

Suganya said:   1 decade ago
Simple method:.

A's one day work 80/20=4%.

A's three days work 12%.

The remaining work is only done by B in that three days=20%-12%=8%.

B's one days work=8/3%.

B completes 100% work in.

8/3% * x =100%.

So x=75/2=37.5.


Post your comments here: