Aptitude - Time and Work - Discussion
Discussion Forum : Time and Work - General Questions (Q.No. 3)
3.
A, B and C can do a piece of work in 20, 30 and 60 days respectively. In how many days can A do the work if he is assisted by B and C on every third day?
Answer: Option
Explanation:
| A's 2 day's work = | ![]() |
1 | x 2 | ![]() |
= | 1 | . |
| 20 | 10 |
| (A + B + C)'s 1 day's work = | ![]() |
1 | + | 1 | + | 1 | ![]() |
= | 6 | = | 1 | . |
| 20 | 30 | 60 | 60 | 10 |
| Work done in 3 days = | ![]() |
1 | + | 1 | ![]() |
= | 1 | . |
| 10 | 10 | 5 |
| Now, | 1 | work is done in 3 days. |
| 5 |
Whole work will be done in (3 x 5) = 15 days.
Discussion:
362 comments Page 5 of 37.
Kanishk said:
6 years ago
@Keerthi.
We are not directly multiplying.
We just use the unitary method. Here the total work done is 1. In fact, in all these sums total work is 1.
Now,
Since 1/5th of the work is done in 3 days,
Therefore, 1 of the work( whole work) is done in 3*5 days.
Hope you understand.
We are not directly multiplying.
We just use the unitary method. Here the total work done is 1. In fact, in all these sums total work is 1.
Now,
Since 1/5th of the work is done in 3 days,
Therefore, 1 of the work( whole work) is done in 3*5 days.
Hope you understand.
Keerthi said:
6 years ago
why are we multiplying 1/5 *3 in the last step? Please explain anyone.
Hrishi said:
6 years ago
Step 1: Work is done by A+B+C in one day can be calculated as 1/20 + 1/30 + 1/60 = 1/10.
Step 2: For the first two days only A is doing work alone so the work is done by A in two days will be 2*1/20= 1/10.
Step 3: Now total work is done in 3 days by A B & C will be = 1/10+1/10= 1/5.
Step 4: But we need a complete work to be done so we have to convert 1/5 to 1 therefore if we do 1/5 work 5 times then work will be completed (1/5 x 5=1).
Therefore 5 x 3 = 15.
Hope you will understand this solution.
Step 2: For the first two days only A is doing work alone so the work is done by A in two days will be 2*1/20= 1/10.
Step 3: Now total work is done in 3 days by A B & C will be = 1/10+1/10= 1/5.
Step 4: But we need a complete work to be done so we have to convert 1/5 to 1 therefore if we do 1/5 work 5 times then work will be completed (1/5 x 5=1).
Therefore 5 x 3 = 15.
Hope you will understand this solution.
(1)
Santosh said:
6 years ago
A =20 Days
B=30 Days
C=60 Days
LCM = A,B,C
LCM = 60
A = 60/20 =3.
B = 60/30 = 2.
C = 60/60 =1.
AFTER 3 DAYS B, C JOINED.
Total =3 + 3(3 + 1) = 15 DAYS.
B=30 Days
C=60 Days
LCM = A,B,C
LCM = 60
A = 60/20 =3.
B = 60/30 = 2.
C = 60/60 =1.
AFTER 3 DAYS B, C JOINED.
Total =3 + 3(3 + 1) = 15 DAYS.
Nirmala Rai said:
6 years ago
3A----20
2B----30
1C----60 this come from L. C. M------60.
Add:all efficiency A+B+C=3+2+1=6.
Per day works of A+B+C=60/6=10.
3days work of A+B+C.
3 = (3+3per day work of A +6 per day work of a+b+c).
3 = 12(Tw=60 if we want 60in the table of 12 then we need to * ...12*5 and also *right side)
5*3 = 12 * 5.
15day = 60. A can do the work in 15 days.
2B----30
1C----60 this come from L. C. M------60.
Add:all efficiency A+B+C=3+2+1=6.
Per day works of A+B+C=60/6=10.
3days work of A+B+C.
3 = (3+3per day work of A +6 per day work of a+b+c).
3 = 12(Tw=60 if we want 60in the table of 12 then we need to * ...12*5 and also *right side)
5*3 = 12 * 5.
15day = 60. A can do the work in 15 days.
Billal Hossain said:
6 years ago
Solution:
A's 3 days work = 3/20.
(B+C)'s 3rd day or 1 day work= 1/20.
(A+B+C)'s 3 days work = (3/20+1/20).
= 1/5.
A's 1/5 part work in 3 days.
1 part ---> 15 days.
A can do the wok in 15 days (Ans).
A's 3 days work = 3/20.
(B+C)'s 3rd day or 1 day work= 1/20.
(A+B+C)'s 3 days work = (3/20+1/20).
= 1/5.
A's 1/5 part work in 3 days.
1 part ---> 15 days.
A can do the wok in 15 days (Ans).
Poonam said:
6 years ago
Here is a solution:
Efficiency A = 3 , B = 2, C = 1 and A+B+C = 6.
Now,
Work done in format ie A can do a work in 2day and next 1day with B&c .
So.
Eff * time = work.
A = 3 * 2 = 6.
A + B + C = 6 * 1 = 6.
Means work done in 3 days is 6 + 6 = 12 work.
Days -------- work
3 -------- 12
? ------- 60 (total work)
Days =(60*3) / 12.
The answer is = 15 days.
Efficiency A = 3 , B = 2, C = 1 and A+B+C = 6.
Now,
Work done in format ie A can do a work in 2day and next 1day with B&c .
So.
Eff * time = work.
A = 3 * 2 = 6.
A + B + C = 6 * 1 = 6.
Means work done in 3 days is 6 + 6 = 12 work.
Days -------- work
3 -------- 12
? ------- 60 (total work)
Days =(60*3) / 12.
The answer is = 15 days.
(1)
RJ Rishi Winston said:
6 years ago
As per the question, A works all days but on every three days A gets assisted by B&C.
Upon calculation through LCM method the total workdays =60 and also with the help of LCM it is possible to find A's & B+C each day work i.e. 60/20 =3, [60/30+ 60/60].
Thus A's efficiency for one day work is 3 and B+C =2+1 =3. On every 3days A finishes 9 work but as he is assisted by B&C on every 3rd day their work also gets added with A's work as a result of which in every 3rd day 9+3=12 work gets completed.
Hence as on every 3rd day, 12 work gets completed the entire work of 60 would be completed by [60*3] /12 =15 days.
Upon calculation through LCM method the total workdays =60 and also with the help of LCM it is possible to find A's & B+C each day work i.e. 60/20 =3, [60/30+ 60/60].
Thus A's efficiency for one day work is 3 and B+C =2+1 =3. On every 3days A finishes 9 work but as he is assisted by B&C on every 3rd day their work also gets added with A's work as a result of which in every 3rd day 9+3=12 work gets completed.
Hence as on every 3rd day, 12 work gets completed the entire work of 60 would be completed by [60*3] /12 =15 days.
Sameer said:
6 years ago
Fraction of work done in one by A, B, and C is,
1/20, 1/30 and 1/60.
In first 2 days, fraction of work completed by A is 2/20.
Third day, B and C are assisting A then fraction of work completed on 3rd day will be
1/20 + 1/30+ 1/60 = 6/60 i.e 1/10.
So total fraction of work done after 3 days.
2/20+1/10=4/20 i.e. 1/5.
So complete work will be completed in 5 days.
1/20, 1/30 and 1/60.
In first 2 days, fraction of work completed by A is 2/20.
Third day, B and C are assisting A then fraction of work completed on 3rd day will be
1/20 + 1/30+ 1/60 = 6/60 i.e 1/10.
So total fraction of work done after 3 days.
2/20+1/10=4/20 i.e. 1/5.
So complete work will be completed in 5 days.
Vivek said:
7 years ago
I can't get 3rd step.
How do 1/10+1/10 came and how it is divided by 5?
How do 1/10+1/10 came and how it is divided by 5?
Post your comments here:
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers

