In __________ welding, the weld may be made either from left to right or from right to left.
fore-hand
back-hand
vertical
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
11 comments Page 1 of 2.

Srinu said:   1 decade ago
Is this correct answer?

Anonymous said:   1 decade ago
The backhand welding is from left to right.

The forehand welding is from right to left.

In Vertical Welding, it depends whether the filler road is preceding or succeeding the metal electrode.

But left or right is a bit misleading as to it should be up to down and vice versa.

Mickey said:   1 decade ago
The correct answer should have been backhand and forehand welding because both of them uses left and right.

Binay singh said:   10 years ago
I think its wrong answer because in a vertical we use top to bottom and vice versa.

Subhashchand said:   10 years ago
That a wrong answer, because vertical in a not welding process, vertical is a position. I think correct answer A or B.

Rabindar(rk) said:   9 years ago
This is right, in vertical welding weld may from both directions.

Ajaya Kumar Sahu said:   8 years ago
Good questions of workshop technology. Thanks for giving this set of questions.

Roshan said:   8 years ago
Yes, this is right. It's welds to both sides.

PRASANTH C N said:   8 years ago
In my opinion Overhead welding is the answer and it is not given in that option.

Vaishali Verma said:   7 years ago
The right answer is flat welding. It takes fh welding and bh welding. And some time in overhead welding.