Mechanical Engineering - Production Engineering - Discussion

Discussion Forum : Production Engineering - Section 1 (Q.No. 40)
40.
In up milling, the thickness of chip is
minimum at the beginning of the cut and maximum at the end of the cut
maximum at the beginning of the cut and minimum at the end of the cut
uniform throughout the cut
none of these
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
13 comments Page 2 of 2.

Hayagreeva said:   7 years ago
I think option B is wrong.

And this up milling is also called CONVENTIONAL MILLING.

Shreekanth hayagreeva...... said:   7 years ago
Up milling is also called conventional milling.
(1)

Salahuddin said:   6 years ago
Downmilling is also called climb milling.
(1)


Post your comments here:

Your comments will be displayed after verification.