5.
In a single point turning operation with a cemented carbide and steel combination having a Taylor exponent of 0.25, if the cutting speed is halved, then tool life will become
Discussion:
8 comments Page 1 of 1.
Manu said:
1 decade ago
VT^n = C 2V1/V2 = (T2/T1)^0.25.
T2/T1 = 16.
T2/T1 = 16.
SYED KHAJA said:
10 years ago
C = (VT)^N.
C = (VT)0.25.
Now V = V/2.
C = (V/2*T)^0.25.
C = (VT)^0.25/16.
16C = (VT)^.25.
C = (VT)0.25.
Now V = V/2.
C = (V/2*T)^0.25.
C = (VT)^0.25/16.
16C = (VT)^.25.
DANU said:
10 years ago
V1(T1)^n = V2(T2)^n.
V1/V2 = (T2/T1)^n.
NOW V2 = V1/2.
2V1/V1 = (T2/T1)^0.25.
T2/T1 = 2^(1/0.25).
= 2^4.
T2 = 16 T1.
V1/V2 = (T2/T1)^n.
NOW V2 = V1/2.
2V1/V1 = (T2/T1)^0.25.
T2/T1 = 2^(1/0.25).
= 2^4.
T2 = 16 T1.
Rahul Soneriya said:
9 years ago
We know that:
V1T1^n = V2T2^n........1.
Given that n = 0.25 and V2 = V1/2.
Put the above values in equation 1.
V1T1^0.25 = V1/2*T2^0.25.
T2/T1 = (2)^4 = 16.
T2 = 16T1 answer.
V1T1^n = V2T2^n........1.
Given that n = 0.25 and V2 = V1/2.
Put the above values in equation 1.
V1T1^0.25 = V1/2*T2^0.25.
T2/T1 = (2)^4 = 16.
T2 = 16T1 answer.
Abdul said:
9 years ago
VT^0.25 = 0.5Vt^.25.
t/T = 2^4 = 16.
t = 16T.
t/T = 2^4 = 16.
t = 16T.
Karthik v k said:
7 years ago
Thanks.
VIPIN said:
6 years ago
VT^n = constant.
n = .25,
initial velocity = V,
final velocity = V/2,
intial time = T1,
FINAL TIME = T2,
VT1^(.25) = (V/2)T2^(.25).
T2 = 16T1.
n = .25,
initial velocity = V,
final velocity = V/2,
intial time = T1,
FINAL TIME = T2,
VT1^(.25) = (V/2)T2^(.25).
T2 = 16T1.
SAMEER ansari said:
6 years ago
Thanks all for explaining this.
Post your comments here:
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers