The determination of standard time in a complex job system is best done through

[A]. stop watch time study
[B]. analysis of micromotions
[C]. grouping timing technique
[D]. analysis of standard data system

Answer: Option D

Explanation:

No answer description available for this question.

Jeevaa said: (Sep 20, 2015)  
How?

Vishnu Singh said: (Feb 12, 2018)  
HOW? Explain.