1. 

A single phase energy meter operates on induction principle.

A. True
B. False

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.

2. 

The accuracy of measurement using CRO is about

A. ± 0.5%
B. ± 0.05 %
C. ± 1%
D. ± 3%

Answer: Option D

Explanation:

No answer description available for this question. Let us discuss.

3. 

The channel required for FM telemetry is

A. same as required for AM telemetry
B. smaller than that required by AM telemetry
C. 100 times that required for AM telemetry
D. 10 times that required for AM telemetry

Answer: Option C

Explanation:

No answer description available for this question. Let us discuss.

4. 

Assertion (A): Absolute instruments are used in standard laboratories.

Reason (R): Absolute instruments do not require calibration.

A. Both A and R are true and R is correct explanation of A
B. Both A and R are true but R is not correct explanation of A
C. A is true R is false
D. A is false R is true

Answer: Option B

Explanation:

No answer description available for this question. Let us discuss.

5. 

Assertion (A): A 3 phase wattmeter consists of two wattmeters mounted in one case.

Reason (R): Power measurement in a 3 phase circuit can be conveniently done by two wattmeter method.

A. Both A and R are true and R is correct explanation of A
B. Both A and R are true but R is not correct explanation of A
C. A is true R is false
D. A is false R is true

Answer: Option A

Explanation:

No answer description available for this question. Let us discuss.