Civil Engineering - Water Supply Engineering - Discussion

Discussion Forum : Water Supply Engineering - Section 4 (Q.No. 25)
25.
Yield of a drainage basin is :
run off of the area expressed as instantaneous rate
average run off over a short period
total volume of water flowing annually
all the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
2 comments Page 1 of 1.

Sonia said:   3 years ago
Runoff long period of time not short.

Pavan said:   5 years ago
The Correct answer should be Option D.

Post your comments here:

Your comments will be displayed after verification.