Civil Engineering - Water Resources Engineering - Discussion
Discussion Forum : Water Resources Engineering - Section 1 (Q.No. 35)
35.
If s is the potential infiltration, P is rainfall in cm in a drainage of a soil with fair pasture cover, the direct run off Q in cm is given by
Discussion:
2 comments Page 1 of 1.
Brahmareddy said:
4 years ago
Exactly right, Thanks @Mukesh.
Mukesh said:
7 years ago
Soil Conservation Services (SCS)-Curve Number(CN) method of estimating Runoff Volume:
Ref: Subramanya book(page number 189) there should be square in the numerator.
Q=(P-0.2S)^2/(P+0.8S) for P>0.2S.
Ref: Subramanya book(page number 189) there should be square in the numerator.
Q=(P-0.2S)^2/(P+0.8S) for P>0.2S.
(5)
Post your comments here:
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers