The initial basin recharge is equal to

[A]. interception
[B]. depression storage
[C]. rain absorbed by the moisture deficiency
[D]. all the above.

Answer: Option D

Explanation:

No answer description available for this question.

Asad said: (May 1, 2017)  
I think it's option C only.

D K said: (Sep 9, 2018)  
I think the answer should be option C.