Civil Engineering - Waste Water Engineering - Discussion

Discussion Forum : Waste Water Engineering - Section 6 (Q.No. 47)
47.
Pick up the correct statement from the following :
the sewer pipes of sizes less than 0.4 m diameter are designed as running full at maximum discharge
the sewer pipes of sizes greater than 0.4 m diameter are designed as running 2/3rd or 3/4th full at maximum discharge
the minimum design velocity of sewer pipes is taken as 0.8 m/sec
all the above.
Answer: Option
Explanation:
No answer description is available. Let's discuss.
Discussion:
4 comments Page 1 of 1.

Faizan said:   9 years ago
I think option A is wrong.

Vktrn said:   7 years ago
I think B is the only correct option.

Anomi said:   7 years ago
Yeah only B is the correct because sewers up to 400mm dia runs at half a depth and min. So, the velocity is 0.45m/s.

Shakir said:   4 years ago
Yes, Only option B is correct.