Civil Engineering - Waste Water Engineering - Discussion
Discussion Forum : Waste Water Engineering - Section 3 (Q.No. 50)
50.
For a grit chamber, if the recommended velocity of flow is 0.2 m/sec and detention period is 2 minutes, the length of the tank, is
Discussion:
5 comments Page 1 of 1.
Kamal buzdar said:
2 years ago
V=0. 2m/sec, t=2min=> 120sec.
Length = V x T = 0.2 x 120 => 24m/sec.
Length = V x T = 0.2 x 120 => 24m/sec.
(10)
Praveen said:
7 years ago
Q=V*A.
Q=V*(BDL/L)
LQ/BDL=V.
detention time t=vol/Q.
120sec=2(m/s)/L.
Q=V*(BDL/L)
LQ/BDL=V.
detention time t=vol/Q.
120sec=2(m/s)/L.
(1)
SONU said:
8 years ago
V * T = 0.2 * 120 = 24.
Baloch said:
8 years ago
V x T.
0.2 x 120(sec) = 24.
0.2 x 120(sec) = 24.
M.Pagavandoss said:
1 decade ago
v = 0.2m/sec = 12m/min, t = 2min.
Length = 2*12 = 24m.
Length = 2*12 = 24m.
(1)
Post your comments here:
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers