Civil Engineering - Waste Water Engineering - Discussion
Discussion Forum : Waste Water Engineering - Section 4 (Q.No. 8)
8.
The angle subtended by the surface of sewer water with partial flow, at sewer centre is 120°, the depth of sewerage is
Discussion:
13 comments Page 2 of 2.
Rahul chauhan said:
7 years ago
@Garry.
The Dia should be 200cm.
The Dia should be 200cm.
Pavan@RGUKTN said:
5 years ago
Sewage will flow at one-forth depth of full, But here the overall depth was not mentioned.
Pramit Samanta said:
5 years ago
I agree, thanks @Virat.
Post your comments here:
Quick links
Quantitative Aptitude
Verbal (English)
Reasoning
Programming
Interview
Placement Papers